Top Menu

What power supply is required to run the Pedestrian Operated Tower Cranes?

All of the Pedestrian Operated Tower Cranes require three phase 380v-400v.

The power supply can be either mains electric or a diesel generator. Mantis have recently upgraded our fleet of generators.

Details on our fleet of generators is available by clicking here.

Designed By